Executive Job-Costing & Burn Telemetry
Real-time multi-site budget monitoring for Vance Commercial & Home Builders LLC (Sample Entity).
Site Westlake Cliffside Luxury Estate has hit 89% of total budget with Trade Code 02-400 (Deep Earth Shoring) exceeding its allocation by 112% ($462k spent vs $410k budget). Verbal orders have been automatically locked.
Active Job Sites Portfolio
5 concurrent Austin projects with real-time CSI cost codes.
Material PO Approvals
45 Cubic Yards High-Strength 5000 PSI Foundation Slurry with Retardant
Site: Westlake Cliffside Luxury Estate • By: Dave Kowalski
“Required for retaining wall anchor footing before rain forecast on Thursday.”
W14x48 ASTM A992 Wide Flange Girders (Seismic Bracing Package)
Site: Austin Metro Medical Pavilion • By: Marcus Sterling
“Level 3 ICU wing bracing; mill certificates attached for engineer review.”
CAT 320 Hydraulic Excavator with Hammer Attachment (7-Day Rental)
Site: Oak Hill Logistics Terminal • By: Caleb Vance
“Existing trench excavator blew hydraulic seal; crew stalled without backup.”